HinderWijzer

The HinderWijzer module helps you estimate the disruption that roadworks cause at a chosen location. You combine historical reference intensities with an execution period, workable hours, and road capacity. Based on that, the module shows day patterns, delay, queue length, and disruption indicators.

Before you can use the HinderWijzer module:

  • you must be logged in
  • the HinderWijzer module must be available in the navigation

Select HinderWijzer in the navigation bar, or open the module via the home page.

HinderWijzer consists of several panels and a fixed status bar at the bottom:

  1. Periods (top left): reference and execution period
  2. Workable hours (middle top left): when work is carried out (WIU)
  3. Daily intensities (top right): reference intensities per weekday
  4. Chart controls (top right, below the table): day pattern correction and chart period
  5. Location (bottom left): map with measuring points
  6. Road capacity (middle bottom left): base and WIU capacity
  7. Disruption impact (middle bottom left, below road capacity): calculated KPIs
  8. Day patterns and Delay and queue development (bottom right): charts
  9. Status bar (bottom): summary of all inputs and loading status

  1. Add at least one reference period
  2. Set the execution period
  3. Set workable hours
  4. Select a measuring point on the map and confirm the location
  5. Select a reference period in the daily intensities table
  6. Set road capacity
  7. View the charts and disruption impact

See Using HinderWijzer for detailed instructions per panel.